page 1Review action
Returned Make Corrections Noted. Mix 5K-45A meets the 5,000 psi 28 day requirement but shows a water to cementitious ratio of 0.47 against the maximum 0.45 required by 03 30 00 paragraph 2.02. Revise the mix and resubmit trial batch data. Mix 5K-45B is acceptable as submitted.