Provide quick response pendent heads with a temperature rating of 155 degrees Fahrenheit in all residential and office areas. Provide intermediate temperature heads rated 200 degrees Fahrenheit within 12 inches of heat producing equipment and in all mechanical rooms. Provide dry pendent heads in areas subject to freezing and in the loading…dock. Concealed heads with factory finished cover plates are required in all areas with a finished ceiling
Ask the project record a question. Get the paragraph and the page, or get told the record does not say.
Corbel searches 53 indexed passages across 23 documents on Brickell Bay Tower: specifications, RFIs, submittal reviews, ASIs, inspection reports and meeting minutes. It returns passages, never summaries, and it returns nothing rather than a guess.
2 cited passages · every term of the question matched against the indexed text
reflected ceiling plan shows an exposed structure ceiling at the loading dock, and specification 21 13 13 paragraph 2.06 requires concealed heads only in areas with a finished ceiling. The same paragraph requires dry pendent heads in the loading dock. Please confirm that exposed upright heads on a dry system are intended…loading dock rather than concealed heads
Passages are ordered by how much of the question they cover, then by cover density within the passage. Nothing above was written by Corbel; each block is the stored text of the cited page with the matched terms marked.