Returned Make Corrections Noted. The submitted warranty form is a fifteen year prorated warranty. Specification 07 52 00 paragraph 1.05 requires a twenty year no dollar limit warranty that is not prorated and does not exclude ponding water of less than forty eight hours duration. Resubmit the correct warranty form. The membrane
Ask the project record a question. Get the paragraph and the page, or get told the record does not say.
Corbel searches 53 indexed passages across 23 documents on Brickell Bay Tower: specifications, RFIs, submittal reviews, ASIs, inspection reports and meeting minutes. It returns passages, never summaries, and it returns nothing rather than a guess.
7 cited passages · every term of the question matched against the indexed text
Furnish the manufacturer's twenty year no dollar limit total system warranty covering membrane, base flashings, insulation, cover board and metal edge, commencing on the date of Substantial Completion. The warranty shall not be prorated and shall not exclude damage from ponding water of less than forty eight hours duration. Furnish…addition the roofing installer's two year workmanship warranty covering repair of leaks arising from defective workmanship, at no cost to the Owner
Roofing contractor confirmed the north elevation parapet raise per ASI-006 is complete between column lines 6 and 11 and that base flashing height was field verified at 8 and one quarter inches. Flood testing of roof area 3 has not yet been scheduled. Owner's representative reminded the Contractor that five…business days notice is required before each flood test under 07 52 00 paragraph
Membrane: 160 mil SBS modified bituminous cap sheet, granulated, over a 100 mil base ply, torch applied. Insulation: polyisocyanurate in two layers, 2.6 inches
Flood test each roof area for forty eight hours with a minimum of 2 inches of water at the high point before installation of overburden. Notify the Owner's representative a minimum of five business days before each test. Areas that fail the flood test shall be repaired and retested in full…additional cost. Written flood test reports signed by the manufacturer's field representative shall be submitted before the warranty will be accepted
Specification section 07 52 00 paragraph 3.04 requires base flashing to extend a minimum of 8 inches above the finished roof surface. At the north elevation between column lines 6 and 11 the constructed parapet measures 6 and one half inches above the finished roof surface after the tapered insulation build
provide the specified 8 inch minimum base flashing height. Reduced base flashing height is not acceptable and would void the twenty year no dollar limit warranty required by 07 52 00 paragraph 1.05. See ASI-006 for the revised parapet detail and the extent of the raise. This is a design clarification
Passages are ordered by how much of the question they cover, then by cover density within the passage. Nothing above was written by Corbel; each block is the stored text of the cited page with the matched terms marked.